The Project Review : Philippine Real Estate News and Update

News and updates on real estate developments and projects; current event news updates; property listings; home and architecture; laws and regulations; education and seminars; people; ecology and environmental issues; geography and history; places of interest and events; travel and tourism; tips and how to; others matters allied to the the Philippine real estate industry. Trivia and rants on anything under the sun.

Friday, November 25, 2011

Update : DPWH Road Repair in Metro Manila Starts November 25

When I read this govenment update on road repair I knew that there will be chaos in the traffic situation of Metro Manila. Imagine simultaneous concrete reblocking and asphalt overlaying in major roads and streets of Metro Manila. The DPWH work and repair start from 10 p.m. until 4 a.m. but the effect on traffic will be 24 hours since the roads that will be affected and under repair  will be impassable anymore. The repair starts today so those who are driving out in the Metro expect heavy traffic. And reminder keep your cool while driving!


DPWH ROAD REPAIR ADVISORY, NOVEMBER 25 TO 28, 2011
2011-11-25
The Department of Public Works and Highway-National Capital Region has advised motorists to expect traffic build-up in some sections of national roads in Metro Manila undergoing repair and improvement works.Concrete reblocking and asphalt overlay activities will take place at 10 PM of November 25 to 4:00 AM of November 28, 2011, and will affect vehicular traffic flow in the following areas:
a) EDSA, Northbound lane going to Monumento, 4th lane from center island (Limits: between Arellano Street and Ponce Street) under supervision of Third Metro Manila District Engineering Office
b) EDSA, Southbound, Quezon City (Limits: infront of JAC to infront of Track City; before Waltermart to Abenson; infront of Panorama; infront of 1009; infront of Hope Christian Academy; and infront of Hope Leadership Institute) under supervision of Quezon City First Engineering District
c) Manila South Road–Muntinlupa (viaduct section, ground level, Alabang, Muntinlupa City (Limits: L and B Compound to taxi terminal) under supervision of Second Metro Manila Sub-Engineering District
d) Zapote Flyover, Barangay Zapote, Las Piñas City (Limits: asphalt overlay of Zapote Flyover including approaches, eastbound, phase 1) under supervision of Second Metro Manila Sub-Engineering District
e) San Juan-Santolan Road, San Juan City, right inner lane (Limits: between 3rd West Crame and 4th West Crame, Km. 10+180 to Km. 10+191.40) under supervision of First Metro Manila Engineering District
f) San Juan-Santolan Road, San Juan City, left inner lane (Limits: between 3rd West Crame and 4th West Crame, Km. 10+209.50 to Km. 10+223; before and after 3rd West Crame, Km. 10+254.70 to Km. 10 + 282.20) under supervision of First Metro Manila Engineering District
g) C-5 Road, Taguig City (Limits: between Libingan ng mga Bayani Road and East Service Road) under supervision of First Metro Manila Engineering District
h) Commonwealth Avenue, Quezon City (Limits: infront of road going to UP Diliman, infront of Technohub, IBP Road and BF, Don Antonio Heights to Nissan) under supervision of Quezon City First Engineering District
i) Katipunan Avenue/C-5, Southbound going to Ortigas Avenue (Limits: 2nd lane from center island between Sunrise Street and Rajah Matanda Street, and between Poseidon Street and Greenmeadows Avenue) under supervision of Quezon City Second Engineering District
Repair and maintenance of these national roads in Metro Manila has been coordinated by the DPWH with the Metropolitan Manila Development Authority.
For any concern, complaint, suggestion, recommendation, observation, please call 165-02; or text DPWH (space) message then send to 2920.

Source :  Office of the President Official Website

                      http://president.gov.ph/





           

No comments:

Post a Comment